CAN I CHOOSE THE LEVEL OF GLOSS?
| Yes you can. Sealer comes in low sheen, semi gloss and high gloss. | |
|
AT WHAT STAGE OF THE BUILDING PROCESS DOES THE CONCRETE SEALING START?
| It is recommended that the Sealing takes place toward the end of the build as much as possible so that no damage is done to the finished product. It is preferred that the kitchen be placed once the Sealing process has finished - with out scratching the floor. | |
|
HOW LONG DOES THE SEALING PROCESS TAKE AND WHEN CAN I WALK ON THE SEALED AREA?
| On Ground concrete we use 3 coats of Sealer and each coat is done 24 hours apart. On a coloured concrete floor we use 2 coats of Sealer and each coat is done 24 hours apart.
There is to be no foot traffic for 5 days and full strength for 28 days (heavy furniture).
However, if you would like to have a High Gloss finish, a different Sealer can be used that is 2 coats with 8 hours between each coat and foot traffic can begin just 12 hours after the final Seal and with full strength after 48 hours. | |
|
IS SEALED CONCRETE SLIPPERY?
| When wet, yes sealed concrete can be slippery, although it is no more slippery than tiles or vinyl.
| |
|
|